Stimulus Watch-Duluth projects total $413,263,980 »
By ebcl on May 24, 2009 in Current Events, Politics, Uncategorized | 1 Comment
I’m hoping the crater-sized pot hole that nearly swallowed my car on a recent trip to Kohls (Sundby Road) falls under MSA street reconditioning. I realize the Lift Bridge takes a lot of paint, but $5,000,000 worth? That’s crazy talk. http://www.stimuluswatch.org/project/by_city/Duluth/MN




